1981

  • Heliostat Foundation

1982

  • Award at international competition in U.S.A. for Construction of Big Scale Solar Air conditioning Project.

1983

  • Design & Construction of first solar residence in Chios Island, Greece.
  • First co-operation with General Electric for Solar products.

1984

  • Construction of Phase I of Solar Air conditioning Project.

1986

  • Construction of Phase II of Solar Air conditioning Project.

1987

  • Implementation of the first Commercial Co-Generation Project for Buildings in Europe (400 KW of electricity, 50 RT refrigeration).

1992

  • Design of the first Co-Generation Project with natural gas in the Industry sector (2,1 MWel,300 RT).

1998

  • Exclusive Representatives of “LG Cable” (Korea) in Greece, now known as “LS Cable”.

2000

  • Construction of the first Project of Co-production with natural gas in Industry sector (2MW of electricity, 340 RT refrigeration).

2002

  • Installation of the first Absorption Chiller (natural gas) in a Hotel. Capacity 120 RT, Hotel CENTRAL, Athens.

2003

  • Distributor of ” Dresser-Waukesha” for Greece & Cyprus.
  • Installation of the first Absorption Chiller (propane gas-LPG) in the Industry.Capacity 100RT, “PETROGAZ SA”, Aspropyrgos.
  • Construction – Supervision – Co-ordination of Project “Sea Water Cooling in the municipality of Hydra”, Hydra Island.

2004

  • Installation of the first Absorption Chiller (natural gas) in a Hospital. Capacity 480 RT, IASO SA., Athens.

2005

  • Exclusive Representative of “PIOVAN” Italy Natural gas PET Drying Systems.
  • Installation of the fist gas drying units in the Industry. Capacity 600 KW, “COCA-COLA SA”, Schimatari.
  • Installation of the first Absorption Chiller (natural gas) in a Public Building.Capacity 240 RT,   new Town hall of Peristeri, Athens.

2006

  •  First Alternative Fuel Co-Generation unit (landfill gas).

Capacity 1.4 MW, Volos.   2007

  • Installation of the largest cooling unit in Greece.Capacity 2*560RT at IASO Hospital.
  • Installation of an absorption chiller. Capacity 360RT at IASO General.

2008

  • Installation of two absorption chillers at  Great Britain Hotel. Capacity 2*320RT.
  • First installation of cogeneration in a hospital. Electrical power 490KW, Heat recovered 890ΚW and Cooling capacity 190RT.

2010

  •  First application of Energy OutsourcingTM under ALPHA LEASING financing.

2012

  •  Distributors of General Electic – Waukesha for engines and services
  • Operation of 2MW CHP unit in Golden Hall mall.

2013

  •  Co-operation with Athens HILTON Hotel.

2014

  •  Selection of two Waukesha VGF P48 GLD 700KW engines by ERGOTEM SA on the first Public bidding on CHP application at 251 Airforce General Hospital.
  • Co-operation with Shuangliang Eco -Energy Systems Co. Ltd in Absorption Cooling Technologies.