1981

 

  • Heliostat Foundation
  • Design & Construction of first solar residence in Chios Island, Greece.

 

1982

 

  • Award at international competition in U.S.A. for Construction of Big Scale Solar Air conditioning Project.

 

1984

 

  • Construction of Phase I of Solar Air conditioning Project.

 

1986

 

  • Construction of Phase II of Solar Air conditioning Project.

 

1987

 

  • Implementation of the first Commercial Co-Generation Project for Buildings in Europe (400 KW of electricity, 50 RT refrigeration).

 

1992

 

  • Design of the first Co-Generation Project with natural gas in the Industry sector (2,1 MWel,300 RT).

 

1998

 

  • Exclusive Representatives of "LG Cable" (Korea) in Greece, now known as "LS Cable".

 

2000

 

  • Construction of the first Project of Co-production with natural gas in Industry sector (2MW of electricity, 340 RT refrigeration).

 

2002

 

  • Installation of the first Absorption Chiller (natural gas) in a Hotel. Capacity 120 RT, Hotel CENTRAL, Athens.

 

2003

 

  • Distributor of " Dresser-Waukesha" for Greece & Cyprus.
  • Installation of the first Absorption Chiller (propane gas-LPG) in the Industry. Capacity 100RT, "PETROGAZ SA", Aspropyrgos.
  • Construction - Supervision - Co-ordination of Project "Sea Water Cooling in the municipality of Hydra", Hydra Island.

 

2004

 

  • Installation of the first Absorption Chiller (natural gas) in a Hospital. Capacity 480 RT, IASO SA., Athens.

 

 

2005

 

  • Exclusive Representative of "PIOVAN" Italy Natural gas PET Drying Systems.
  • Installation of the fist gas drying units in the Industry. Capacity 600 KW, "COCA-COLA SA", Schimatari.
  • Installation of the first Absorption Chiller (natural gas) in a Public Building. Capacity 240 RT,   new Town hall of Peristeri, Athens.

 

2006

 

  •  First Alternative Fuel Co-Generation unit (landfill gas).

     Capacity 1.4 MW, Volos.

 

2007

 

  • Installation of the largest cooling unit in Greece.Capacity 2*560RT at IASO Hospital.
  • Installation of an absorption chiller. Capacity 360RT at IASO General. 

 

 

2008

 

  • Installation of two absorption chillers at  Great Britain Hotel. Capacity 2*320RT.
  • First installation of cogeneration in a hospital. Electrical power 490KW, Heat recovered 890ΚW and Cooling capacity 190RT. 

 

 

 